Development of Thrie-Beam Retrofit for Upgrading Obsolete Bridge Rails
Report Number(s): 615131-01
Description: The installation consisted of a 10-gauge thrie beam guardrail system mounted to 33 posts anchored to a concrete curb on a bridge deck. On both the upstream and downstream ends, the thrie beam transitioned to a Texas Department of Transportation (TxDOT) Downstream Anchor Terminal (DAT). The length-of-need for this installation was 100 ft.
Test Level: 3
MASH Test Number: 3-10 , 3-11
Proprietary/Non-proprietary: Non-proprietary
Pass/Fail: Pass
Evaluation: Full-Scale Crash Testing
Sponsor: Roadside Safety Research for MASH Implementation Pooled Fund
Test Article Description
Deck Thickness: 12"
Test Article Description
Material: Steel
Aesthetic: No
See Through: No
Retrofit: Yes
Combo. (Veh/Ped): limited pedestrian use
Report(s):