[FAILED] – Asphalt Tied-Down Anchorage for Portable Concrete Barrier (MASH 2016)

Report Number(s): TRP-03-386-19

Description: WisDOT PCBs in a pinned, tie-down configuration for use with asphalt.

Test Level: 3

Barrier Type: F-Shape

MASH Test Number: 3-11

Proprietary/Non-proprietary: Non-proprietary

Pass/Fail: Fail

Evaluation: Testing + Engineering Analysis

Sponsor: Wisconsin Department of Transportation

Test Article Description

Height: 32"

Section Length: 12'6"

Connection Type: Pin and Loop

Ground Connection: Pinned

Deflection: 24.5"

Report(s):

TRP-03-386-19