MASH Testing of Bullnose with Breakaway Steel Posts (Test Nos. MSPBN-4 through MSPBN-8)
Report Number(s): TRP-03-418-20
Description: The Phase II study of barrier system consisted of a bullnose median barrier, assessed with MASH TL-3 criteria. The bullnose system was constructed with twenty-nine posts, which included fifteen posts on Side A and fourteen posts positioned on Side B. Mounting height was 31.6 in.
Test Level: 3
MASH Test Number: 3-30, 3-31, 3-33, 3-37b
Proprietary/Non-proprietary: Non-proprietary
Pass/Fail: Pass
Evaluation: Full-Scale Crash Testing
Sponsor: Midwest Pooled Fund Program
Test Article Description
Scupper: No
Report(s):
https://mwrsf.unl.edu/researchhub/files/Report393/TRP-03-418-20.pdf