MGS Transition from Full to Quarter-Post Spacing
Report Number(s): 610211-01-4
Description: The 181 ft-3-inch-long test installation was comprised of a 31-inch high, 12-gauge, 4-space, W-beam guardrail system. The W-beam rail was supported by 72-inch wide-flange posts with 14-inch-tall wood blockouts. TxDOT DATs terminated each end of the guardrail system. Beginning with the upstream DAT, there were four distinct sections of the installation:
- a 49 ft-3-inch-long section (posts 3 through 10) with full post spacing at 75 inches;
- a 75-inch-long transition section (posts 10-11-12) with half post spacing at 37½ inches;
- a 62 ft-6-inch-long section (posts 12 through 52) with quarter post spacing at 18¾-inches; and
- a 43 ft-9-inch-long section (posts 52 through 60) with post spacing at 75 inches. In the full post spacing sections, a 10-inch button-head guardrail bolt secured each blockout to a post.
Test Level: 3
MASH Test Number: 3-21
Proprietary/Non-proprietary: Non-proprietary
Pass/Fail: Fail
Evaluation: Full-Scale Crash Testing
Sponsor: Texas Department of Transportation
Test Article Description
Height: 31"
Rail Type: W-Beam
Rail Thickness: 12-Gauge
Post Type: 72" Wide-Flange
Material: Steel
Post Total Length: 181' 3""
Post Spacing: 75"
Blockout Type: Wood
Aesthetic: No
Special Configuration: transition