• WSDOT Home
  • TTI Home
  • Contact Us
  • ABOUT
  • PROJECTS
  • MASH
  • NEWS
  • TTI RESEARCHERS
  • EVENTS
  • PARTNERS PAGE
  • Breakaway Devices
  • Bridge Rail
  • Cable Barrier
  • Concrete
  • Crash Cushion
  • Guardrail
  • Transition
  • Work Zone Devices

Status

Keyword

Results

Bridge Barrier to Guardrail Transition with Sidewalk for MASH TL-3 (TTI-622811, T1969-B6)
Summary Report for Pooled Fund Program TPF 5(343) (TTI-620311, T4541-FH)
Trajectory Validation Simulation with the MnDOT P-1 Parapet with Sidewalk and 8-inch Curb (TTI-606881, T4541-CJ)
MASH Test 3-11 Evaluation of Combination Traffic-Pedestrian-Bicycle Bridge Railing (Supplemental) (TTI-611971-02, T4541-DH)
Bridge Rail End Treatments Guidance for Constrained Sites (TTI-621131, T1969-AQ)
Evaluation of Open Joints in Concrete Bridge Rail Systems (TTI-619651, T1969-FG)
Development of Thrie-Beam Retrofit for Upgrading Obsolete Bridge Rails (615131/Task Order EA)
Engineering Support and Recommendations for Roadside Safety Issues/Problems (610811)
Determination of Pedestrian Rail Offset Requirements to Eliminate Vehicle Interaction (611991/Task Order DI)
Feasibility Study for Addressing Extreme Site Constraints at Bridge Ends (602941)
Small Bridge Barrier/Guide Rail Retrofits — Phase I (602181)
Prestressed Concrete Beam Type TL-2 Guardrail System at 31-inch Rail Height (600771)
W-Beam Bridge Rail for Temporary Timber Deck Bridge Installations (405160-40)
Best Practices for Barrier Protection of Bridge Ends (405160-38)
U.S. 11 Lake Pontchartrain Bridge Rail Replacement (405160-16)