• WSDOT Home
  • TTI Home
  • Contact Us
  • ABOUT
  • PROJECTS
  • MASH
  • NEWS
  • TTI RESEARCHERS
  • EVENTS
  • PARTNERS PAGE
  • Breakaway Devices
  • Bridge Rail
  • Cable Barrier
  • Concrete
  • Crash Cushion
  • Guardrail
  • Transition
  • Work Zone Devices

Status

Keyword

Results

Development of Thrie-Beam Retrofit for Upgrading Obsolete Bridge Rails (615131)
MASH Evaluation of F-Shape and Single-Slope Concrete Barriers with Drainage Scuppers (612831)
Engineering Support and Recommendations for Roadside Safety Issues/Problems (610811)
Determination of Pedestrian Rail Offset Requirements to Eliminate Vehicle Interaction (611991)
Feasibility Study for Addressing Extreme Site Constraints at Bridge Ends (602941)
Small Bridge Barrier/Guide Rail Retrofits — Phase I (602181)
Prestressed Concrete Beam Type TL-2 Guardrail System at 31-inch Rail Height (600771)
W-Beam Bridge Rail for Temporary Timber Deck Bridge Installations (405160-40)
Best Practices for Barrier Protection of Bridge Ends (405160-38)
U.S. 11 Lake Pontchartrain Bridge Rail Replacement (405160-16)