• WSDOT Home
  • TTI Home
  • Contact Us
  • ABOUT
  • PROJECTS
  • MASH
  • NEWS
  • TTI RESEARCHERS
  • EVENTS
  • PARTNERS PAGE
  • Breakaway Devices
  • Bridge Rail
  • Cable Barrier
  • Concrete
  • Crash Cushion
  • Guardrail
  • Transition
  • Work Zone Devices

Status

Keyword

Results

Buried-in-Backslope Terminal Variations in Foreslope, Backslope, and Ditch Configurations
MASH TL-3 Evaluation of a Median Guide Rail Transition to Median F-Shape Concrete Barrier
Transition Between Guardrail and Tangent Anchored Portable Concrete Barriers (616391)
Guidelines for Attaching MASH-compliant Thrie Beam Transitions to Rigid Concrete Barriers other than the Rigid Barrier Tested (616001)
An Exploration into Variations in Guardrail Approach Transitions to Rigid Barrier (615991)
MASH Test 3-21 Evaluation of Short W-Beam Transition (613121)
MASH Full Scale Crash Testing of the Transition from the MGS Weak Post System to the Strong Post MGS System (612051)
Design and Testing of a MASH TL-3 Thrie-Beam System for Roadside and Median Applications (614341)
Transition Design for Temporary Concrete Barrier Pinned on Asphalt to Rigid Concrete Barrier (605641)
MASH Finite Element Analysis and Full-Scale Crash Testing of Stacked W-Beam Transition for 31-inch Guardrail (604581)
Design and NCHRP Report 350 Finite Element Analysis of Stacked W-Beam Transition for 31-inch Guardrail (601721)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement — Phase II (601651)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement (405160-36)
Transition Design for Anchored to Rigid Barrier (405160-34)
Transition Design for Temporary Concrete Barrier (405160-26)