ABOUT
PROJECTS
MASH
NEWS
TTI RESEARCHERS
EVENTS
PARTNERS PAGE
Breakaway Devices
Bridge Rail
Cable Barrier
Concrete
Crash Cushion
Guardrail
Transition
Work Zone Devices
Search
Reset
Status
All
Completed Projects (11)
Ongoing Projects (5)
Keyword
Results
MASH Test Level 3 Evaluation of a Shorter Thrie-Beam Approach Transition (Task Order FE)
Buried-in-Backslope Terminal Variations in Foreslope, Backslope, and Ditch Configurations
MASH TL-3 Evaluation of a Median Guide Rail Transition to Median F-Shape Concrete Barrier (Task Order FB)
Transition Between Guardrail and Tangent Anchored Portable Concrete Barriers (616391/ Task Order EK)
Guidelines for Attaching MASH-compliant Thrie Beam Transitions to Rigid Concrete Barriers other than the Rigid Barrier Tested (616001)
An Exploration into Variations in Guardrail Approach Transitions to Rigid Barrier (615991)
MASH Test 3-21 Evaluation of Short W-Beam Transition (613121)
MASH Full Scale Crash Testing of the Transition from the MGS Weak Post System to the Strong Post MGS System (612051)
Design and Testing of a MASH TL-3 Thrie-Beam System for Roadside and Median Applications (614341/Task Order DX)
Transition Design for Temporary Concrete Barrier Pinned on Asphalt to Rigid Concrete Barrier (605641)
MASH Finite Element Analysis and Full-Scale Crash Testing of Stacked W-Beam Transition for 31-inch Guardrail (604581)
Design and NCHRP Report 350 Finite Element Analysis of Stacked W-Beam Transition for 31-inch Guardrail (601721)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement — Phase II (601651)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement (405160-36)
Transition Design for Anchored to Rigid Barrier (405160-34)
Transition Design for Temporary Concrete Barrier (405160-26)