ABOUT
PROJECTS
MASH
NEWS
TTI RESEARCHERS
EVENTS
PARTNERS PAGE
Breakaway Devices
Bridge Rail
Cable Barrier
Concrete
Crash Cushion
Guardrail
Transition
Work Zone Devices
Search
Reset
Status
All
Completed Projects (16)
Ongoing Projects (2)
Keyword
Results
Evaluation of MASH TL-3 Transition Design with a Storm Drain – Crash Test of 1100C Vehicle (Small Car) (TTI-619551, T1969-AG)
MASH Test Level 3 Evaluation of a Shorter Thrie-Beam Approach Transition (TTI-618981, T4541-FE)
Buried-in-Backslope Terminal Variations in Foreslope, Backslope, and Ditch Configurations
Evaluation of a Median Guardrail Transtion to Median F-Shape Concrete Barrier (TTI-618851, Task Order-FB)
Transition Between Guardrail and Tangent Anchored Portable Concrete Barriers (616391/ Task Order EK)
Guidelines for Attaching MASH-compliant Thrie Beam Transitions to Rigid Concrete Barriers other than the Rigid Barrier Tested (Task Order ED/616001)
Evaluation of MASH TL-3 Transition Design with a Storm Drain Inlet – Transition Development and Crash Test of 2270 Vehicle (Pickup Truck)(615251/ Task Order DY)
An Exploration into Variations in Guardrail Approach Transitions to Rigid Barrier (615991/Task Order EE)
MASH Test 3-21 Evaluation of Short W-Beam Transition (613121/Task Order DO)
MASH TL-3 Full Scale Crash Testing and Evaluation of Transition from 32-inch Tall Weak-Post Guardrail System to MGS Strong Post System (612051/Task Order DE)
Design and Testing of a MASH TL-3 Thrie-Beam System for Roadside and Median Applications (614341/Task Order DX)
Transition Design for Temporary Concrete Barrier Pinned on Asphalt to Rigid Concrete Barrier (605641)
MASH Finite Element Analysis and Full-Scale Crash Testing of Stacked W-Beam Transition for 31-inch Guardrail (604581)
Design and NCHRP Report 350 Finite Element Analysis of Stacked W-Beam Transition for 31-inch Guardrail (601721)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement — Phase II (601651)
Transition for Anchored Temporary Concrete Barrier System in Asphalt Pavement (405160-36)
Transition Design for Anchored to Rigid Barrier (405160-34)
Transition Design for Temporary Concrete Barrier (405160-26)