Professional Opinion Projects

Professional Opinion Projects

NEW! 17-5 – Michigan Temporary Concrete Barrier Limited Deflection

20-08 – Utah Sign Support Bracket Sacrificial Pin Design for 115 mph Wind Speed

20-06 – Utah 42-inch BA-3K without P1 Bars

19-02 – Butterfly Reflectors

18-30 – 42-inch-10.8-degree Parapet MASH TL-4 Compliance Assessment

18-27 – Oregon F-Shape Free-Standing Barrier MASH TL-3 Assessment

18-26 – Omitted Post

18-23 – In-Line Anchor

18-22 – Painted Guide Rail

18-09 – W-Beam to Concrete Transition

18-08 – Concrete Barrier Height Transition

18-05 – Thrie-beam at System at Bridge Column

18-03 – Steeper Face F-Shape

18-02 – 2-Tube Bridge Rail for MASH TL-4

18-01 – Type 9 Single Slope Bridge Rail for MASH TL-4

17-06 – Concrete Shape Transitions/Transitioning From Different Shapes

17-03b – TxDOT Thrie-Beam Transition to Concrete Barrier

17-03 – 18 ft-9 inch Thrie Beam Transition

17-02 – 32-inch F-Shape Cast-In-Place Barrier


2022-07-27